I plan on updating the blog as we work on the projects Brad and I left for ourselves. Just because we passed the final inspection doesn’t mean we’re done. I have a list of at least 20 things we need to tackle. Our current top priorities are installing the wooden sun screens on the laundry room, getting Brad’s workshop in order (so we can find the tools ASAP instead of digging through boxes for 15 minutes), putting in a limestone and gravel path from the house to the garage, and moving my office back out to the garage! Hopefully that last one will happen over the extended weekend.
Tuesday, November 25, 2008
Day 154
Thursday, November 20, 2008
Day 144-153
Now onto the good stuff…
Note to all
- The motion light doesn’t work and the back plate leaves a gaping hole in the stucco. After working on it four times they’ve only gotten the back plate fixed.
- The double light switches for the ceiling fans/lights turn on the same fixture and don’t work on the other. This is fixed, but still odd. I’ll leave it at that.
- They cut the hole for the bathroom vent too long and left a visible hole. Their first solution was to reposition the vent (so the hole ended up on the other side). I hope they weren’t surprised when I told them their solution was unacceptable. Next they used caulk to try to hide the hole. That looked completely ridiculous. Then they cut a sliver of drywall to fill the hole but didn’t tape/float it. Finally my contractor had Lazaro fix the hole and billed it back to Bryant Electric.
- This is the best! Even better than the bathroom vent. They came back to hook up wiring for the tankless water heater (it’s gas, but needs electricity too). To do this they unplugged the dryer and plugged the water heater into the dryer’s outlet! What this means is the water heater, dryer, and washing machine cannot all work together. One has to be unplugged. Genius! To fix this they ended up installing a piggyback-type outlet, so the outlet is about six inches deep. This isn’t good because then the washer and dryer have to stick out six inches. They’re supposed to fix that today, so I can’t wait to see what they do this time.
- They installed another piggyback-type outlet at the top of the stairs. Apparently this is code, but they didn’t ask us about placement. It sticks out so far we’re worried someone going down the stairs will trip over it. Hopefully that will be fixed today. I also think this is the reason for a hairline crack in the stucco about a foot above the outlet.
- They couldn’t figure out how to install the Ikea track lights we got for the kitchen, so I had to fill multiple “mistake” holes in the ceiling.
I think that’s it. It’s quite possible I’m leaving something out. It’s a long list to keep track of. I really hope the next post has nothing to do with electrician problems.
On a more positive note I cannot tell you how much I love our ductless heating and air conditioning unit. It is the greatest thing ever! It’s so quiet I can’t tell when it’s on. I haven’t been able to truly test it since my office isn’t up there yet, but while I’ve been painting it’s been great. The guys who installed it were great too. They arrived with a giant glass carafe of coffee—the drip-coffee kind that’s in the shape of an hourglass with the leather wrap around the middle. There’s something uniquely
Another positive is that the floors are done and gorgeous. We are so lucky to have old oak floors in such great shape. I’m thankful the previous owner had covered them up with ugly black carpet squares. To fix the hole where the floor heater used to be and where the kitchen wall used to be they simply pulled up all the hardwoods on the kitchen/dining room side and mixed in a few pieces of old with new.
I don’t think I wrote about our picky tile guy, Randy. He did a great job too, but not without a wee bit of drama. He wouldn’t work while anybody else was there, so he put us behind by at least three days. I guess when you’re really good at your job you get what you want. Still, I think it was absolutely ridiculous. To clarify, Randy only did the subway tile in the shower. Brad, my hero, laid the penny tile on the floor. He doesn’t think he did a good job, but I think it looks gorgeous!
I haven't been able to get a great shot of the bathroom. I think my lens needs a cleaning because photos aren't coming out right lately. However, my wide-angle lens seems fine, so here's a better photo of the bathroom using that. Note that I haven't tackled painting the wood trim yet (and the quarter-round hasn't been installed).
A shot of my office and the bedroom (on the other side of the half-wall):
Monday, November 10, 2008
Day 129-143
Here's where we're at today. The electrical is done (although not without a lot of mistakes and frustration). The floor guy showed up this morning (he was supposed to be here last Wednesday--and before that the last week in October). The plumbers showed up after lunch, but they're not done. If all goes well things will be wrapped up by Wednesday and we can ask for a final inspection at the end of the week. Having said that I'm sure we'll fail our inspection. I don't know why, but considering the only one we passed on the first try was our insulation inspection, I'm just expecting this thing to drag out another week.
I owe this site a bunch of photos. Most importantly the bathroom. It is the only room that's finished (except that the water's shut off and I haven't painted the woodwork). It has tile, painted walls, lights, a toilet, sink, and tub/shower. It looks great! The tile guy did a great job on the tub/shower and Brad did an amazing job on the floor. I got my penny tile after all. Now if I could just prevent the workers from ruining everything (they already dropped spackle on the grout and rubbed it in).
Here's a photos of the lighting in the kitchen/dining area:
And here are a couple photos of the exterior:
I decided this simply wouldn't be a typical post if I didn't share at least one strange story about the project. The lastest snag is with the garage door openers. They still haven't been installed. The installers came several times to install them and each time left without installing anything. Apparently the support beam on the ceiling is in the way. They decided to lower the track, but since it still wasn't low enough for the chains to clear the beam they wanted to lower it even more. We didn't want this because it would take about two feet off height in the garage away. Their other solution was to cut through the beam and then have someone else come in and reinforce it. No thanks. The garage door people couldn't come up with a solution, so Brad did (typical). The solution was to install side mount openers. Get this: the garage door company doesn't know how to install them (or won't). They're not going to help us. However they sell the openers for 2x what they cost online! And they call themselves the Overhead Door Company?! I think not.