In other news, Lazaro and Arturo haven’t worked at our site in over a week. I think our contractor is playing us because on Friday he asked me if the siding had arrived (how would he know since he’s never on site). I told him it hadn’t and he said it was a good thing he didn’t send Lazaro over that day, but that he’d be there to work on the siding on Monday. On Monday (this morning) I called him at 8:30 to tell him the siding arrived. He then called Brad sometime in the afternoon and told him Lazaro wasn’t going to be over today because the siding had just arrived. Interesting. I would rather be told someone’s not going to show up instead of being told a fib. Hopefully we’ll see Lazaro tomorrow.
Now for some bad news. We had our first inspection today and we didn’t pass. It was a site inspection and the only reason we didn’t pass was because the roof of the garage is too close to the property line. David said he’s going to fight the issue since the roof should be grandfathered in. If we lose the fight we have to cut part of the roof off. I don’t fully understand it, but it sounds ridiculous. Hopefully David will make us proud and make it so we don’t have to do such a dumb thing. Considering one inspector already passed the site plans it doesn’t make sense that our plan would fail in person. I predict much inspection drama coming our way…
1 comment:
Wow! Those inspectors are a pain, Geeeez!!!
Post a Comment