We had rain the first part of last week, so things on the garage haven't progressed that much. The HVAC people came the last part of the week and installed the wiring and plumbing for the ductless heating and AC unit we're getting. The electricians were supposed to arrive Thursday or Friday but didn't.

As for stuccoing, Red said he would probably start on the scratch coat Monday (day 66). He thought if the weather held up he'd be done Thursday. That would be great because once the stuccoing is done the bottom of the garage can be finished (they don't want to do the bottom first because they don't want the stucco to get on any finished exterior work). In the photos you might be able to notice there's a wire mesh covering the Tyvek.




I asked our contractor when he thought the project would be completed. He told me to ask him in two weeks after the inspections start happening. He thinks the inspection will hold things up by at least another week or two, so the garage definitely won't be done in mid-September. I can hope for the end of September, but that might be wishful thinking.

No comments: